Frames during construction
Project hide info

Chelsea Flower Show Garden 2008 - with Philip Nash Design

The substructure of tubular-steel framing clad in Corian to the walkways and platforms was supported on structural-glass columns. The surfaces peeled upwards to form tables and seating, and were shaded by a leaf canopy 4 metres high. The structure was designed in components, both to allow the tight show construction programme to be met, and to enable dismantling and reinstallation in a new home after the show.

Frames during construction
show credits
< >